Friday, March 9, 2012

Traceable fixed cost

A traceable fixed cost of a segment is fix cost that is incurred because of the existence of the segment - if the segment had never existed, the fixed cost would not have been incurred; and if the segment were eliminated, the fixed cost would disappear.

No comments:

Post a Comment